Job Description
Project: USAID Green Annamites
Office: ECODIT, 5 th Floor Sen River, Da Nang, Vietnam
Position Information: Technology (IT) Consultant
Duty station: Da Nang, Vietnam
Work area: This position will be based in Danang, Vietnam
Starting date: As soon as possible
PROJECT OVERVIEW
ECODIT is implementing the USAID-funded Green Annamites activity (the GA Project) in Quang Nam (QN) and Thua Thien Hue (TTH) provinces in central Vietnam. The purpose of the Green Annamites activity is to assist Vietnam’s transition to climate-smart, low emission, and resilient development that protects people, landscapes, and biodiversity in Vietnam’s priority forested provinces. The project’s overall period of performance is September 26, 2016 to December 16, 2020, subject to the availability of funding, and includes three main tasks:
Key program results include improving the livelihoods of 20,000 forest dependent people; improving biodiversity of over 400,000 hectares of natural forest, mobilizing at least $20 million in public and private resources for sustainable livelihoods and forest conservation; and avoiding and/or removing the equivalent of at least 7 million metric tons of carbon dioxide from the atmosphere.
The GA Project is entering to the fourth year of its implementation and during that last year, the Project wants to enhance the monitoring, evaluating, reporting and compiling the data from the supported activities. Therefore, the GA Project seeks a qualified IT consultant to provide technical support on renovating the online M&E system of the GA Project. The Consultant shall conduct all activities and prepare deliverables under the overall supervision of the Chief of Party (COP), Deputy Chief of Party (DCOP) and direct supervision of M&E Specialist based in Da Nang, Vietnam.
A user manual for the current system is posted together with the SOW for reference. For more details on the current system and the consultancy requirements, the Project is offering the interested candidates to participate on the online presentation of the system, via Skype on January 20 th (Monday). Please register to the conference by January 16th with Mr. Ong Dinh Bao Tri (0905225761, [email protected] , Skype: ongdinhbaotri).
OBJECTIVES
DUTIES & RESPONSIBILITIES
LEVEL OF EFFORT, REPORTS, DELIVERABLES, AND TIMELINE
The assignment will be implemented from Feb 30 th to April 15 th , 2020, with total level of effort (LOE) is not exceed 20 days, based on the break-down in the Exhibit 1 below. All reports are required in English.
Exhibit 1. Deliverables and Due Dates
ID | Deliverable | Description | LOEs | Due Date |
1 | Inception note | The inception note specifies conceptually the approaches/techniques and algorithms to the issues/ items requested in this SOW | 3 | 7 working days from the contract sign |
2 | Data verification process for activity progress and indicator integrated into the activity reporting page | The system allows for 1) data approval process: PM submit data and the lead/ supervisor approve to finalize the reported data, then the system lock itself at the reported record, 2) the activity reporting page become expired/ read only after the implementation phase. Submit a summary of the work done. | 5 | 7 days from the inception approval |
3 | Accumulative and progress reports | Reports that crosstabling the indicator progress/ accumulative information by year/quarter, with graphically presentation of the indicator progress/ accumulative information in the form of tables and charts. The charts include: indicator accumulative/ progress by year against project/ annual targets, indicator accumulative/ progress by quarter for a specific year. Note that, the report of indicator progress/ accumulative data need to be made together with the disaggregation of gender, geographical location, sector (public, private, community). Submit a summary of the work done. | 4 | 7 days from the second deliverable |
4 | Capacity building tracker integrated into activity reporting page | Institutional capacity building tracker developed and integrated into the activity reporting page so that IP and PM can undertake reporting from the activity level. Submit a summary of the work done. | 3 | 5 days from deliverable 3 |
5 | Supporting document uploading and retrieving enhanced | The system allows for an efficient tracing back the supporting documents relating to the progress of an indicator for a specific quarter in a year. Submit a summary of the work done. | 2 | 5 days from deliverable 4 |
6 | Bug fix | Fixing a number of bugs: trapping the date/time format error, number format error, field size length error at specific locations in the system. Submit a summary of the bugs fixed | 2 | 5 days from deliverable 5 |
7 | Final report | Description of the tools developed and user guide notes | 1 | 5 days from deliverable 6 |
| Total working days |
| 20 days |
|
REQUIRED QUALIFICATIONS:
Interested candidates should send an application package including:
By February 25th, 2019 to the following address: [email protected]
No phone calls please. Only shortlisted candidates will be contacted for an interview.