CALL FOR EXPRESSION OF INTEREST (EOI)
FOR MATERIAL RECOVERY FACILITY'S EQUIPMENT MANUFACTURING AND CONSTRUCTION
Vietnam Flagship Program – CLEAN CITIES FOR A GREEN VIETNAM
SNV is a not-for-profit international development organisation that makes a lasting difference in the lives of people living in poverty by helping them raise incomes and access basic services. We focus on three sectors and have a long-term, local presence in over 25 countries in Asia, Africa and Latin America. Our team of more than 1,300 staff is the backbone of SNV. For more information: www.snv.org.
Vietnam is a thriving country with a large and growing population, limited existing waste management infrastructure (high levels of mismanagement/leakage into environment), and yet a rapidly increasing rate of plastic consumption (6% CAGR). According to a study initiated by the National Plastic Action Platform (NPAP) Vietnam, most plastic waste (51%) is mis-managed or leaked into the environment while only 38% is incinerated or goes to an engineered landfill and 11% is either formally or informally recycled. In a business-as-usual scenario, the mis-managed plastic waste will double by 2030 to approximately 3 million tons/year. The Vietnam government has shown a strong commitment to addressing this challenge with recent policy interventions such as the new Environmental Protection Law (2020), the National Strategy on Integrated Management of Solid Waste (2018), the NPAP formation (2020), and the initiation of an Extended Producer Responsibility (EPR) scheme for packaging to be launched in 2024.
To help Vietnam tackle this issue, SNV Netherlands Development Organisation submitted the Clean Cities for a Green Vietnam (CCGV) project proposal to the Alliance to End Plastic Waste (AEPW) to implement a multiple large-scale, integrated, sustainable, and holistic waste management infrastructure project leveraging proven technologies in selected cities through a consortium of partners that will provide a reference for accelerated replication across the country.
CCGV project brief
The objective of the CCGV project is to reduce plastic waste leakage into the environment in Viet Nam, in particular, to reduce plastic debris into water bodies, rivers and ocean, and reduce the plastic mismanaged in landfills, dumpsite or incinerated.
To reach this objective, the CCGV project targets to divert 15% to 20% of the plastic waste to be collected for recycling in Hanoi and Ho Chi Minh. This will be achieved by improving the solid waste management system and integrating a circular economy approach to segregate, sort, process and recycle or recover plastic materials.
In particular, CCGV is willing to support the local governments to put into practice the national policies, with technical and financial support on awareness campaigns to promote source segregation; develop skills and provide equipment for segregated collection; invest in the construction and operate sorting and pre-processing facilities and; stimulating a reclaiming and recycling market, with emphasis on the low value plastic. All the above considering the integration and do-no-harm approach of the large informal sector working on collection, sorting and recycling of plastic waste.
Objective of the assignment
This assignment is part of the Component 3 of the CCGV project: “Increase sorting and processing capabilities”. The focus on this component is to design, construct and operate Material Recovery Facilities (MRF) to increase the volumes of recyclable materials diverted from going to landfills and incinerators. This must ensure the supply of steady amount of materials and with the required quality and specifications for the market.
Through the feasibility phase (2022), different potential locations for MRF have been identified and assessed by the consultants and SNV team, including a technical feasibility assessment and an economic analysis. This resulted in a varied of models, size and capacities of these sorting facilities, which may provide a variety of experiences and lessons for the country and the project.
During the project implementation, an engineering firm will develop the detailed construction and manufacturing design of the facilities’ equipment and infrastructure. Based on that design, CCGV aims to hire a Vietnamese equipment manufacturer and construction company to execute the works.
Note: A Material Recovery Facility (MRF) is a facility that receives mixed solid waste recyclables, sorts by size, positively or negatively target sorts by characteristic, to make a freight-ready package to go to market.
Scope of Work
The manufacturing and construction company will follow the provided technical designs to manufacture the sorting equipment, installation of the equipment and construction of the facilities required for the project in Hanoi and HCMC.
In principle, 3 facilities will be placed in Hanoi city (different districts) and 1 facility in HCMC.
During the manufacturing, installation, and construction, two external firms (one Vietnamese and one international) will supervise the works to ensure correct execution and functioning.
A. Manufacture the sorting equipment: the company will follow the technical designs to manufacture the sorting equipment. The potential list of equipment is proposed below:
Item # | Equipment Piece | Example Specification | Comments |
1 | Infeed Conveyor | 1.0MX7.0M at 35? incline, variable speed drive 2 – 20M/min | Hopper feed sized for small bucket loader |
2 | Vibratory Screen | Finger screen style with 50.0mm openings | Removes fines |
3 | Drum Magnet | 1.0 – 1.5M diameter undermounted drum | Refined waste data needed for final design |
4 | Presort Conveyor | 1.2MX7.0M, single speed drive 20M/min | Manual sort to remove problem materials |
5 | Post-Presort Conveyor | 1.2MX3.5M single speed drive 30M/min | Elevates material to Optical Sorter (OS) |
6 | Spreader | Twin disk or other effective design | Spreads material across width of OS entry mouth |
7 | Optical Sorter (OS) | 2.4 – 2.8MN wide, NIR and metal detect sensors | Single-eject (base) dual eject (optional) |
8 | PE Film Sort Conveyor | 1.2MX8.0M, single speed drive 30.0M/min | Manual sort for capturing rigid PE to bunker below and cleaning of unsorted PE film for end of line |
9 | Other materials sort transfer conveyor | 0.6MX6.0M single speed drive 20.0M/min | Elevates other materials to sort conveyor |
10 | Other material sort conveyor | 0.6MX7.0M, single speed drive 30.0M/min | Manual sort to remove recyclables passing through the OS |
11 | Non-Eject conveyor | 0.6MX7.0M, single speed drive 20.0M/min | Conveys non-eject materials to waste pit |
12 | Baler Feed Conveyor | 1.5MX9.0M, single speed drive 12.0M/min | Feeds baler |
13 | Baler | Horizontal Auto-Tie | Bales plastics and metal to export quality bale |
B. Construction of infrastructure: The company will execute the works in each of the MRF project sites following the provided designs. The MRF infrastructure may include some of the following elements:
C. Installation and testing of equipment: The company will install all the manufactured equipment (or imported in case of some specialised equipment) in each of the MRF project sites. Moreover, all the equipment will be tested, and the company will provide service to adjust and repair any element for a period of 1 year after commissioning.
For more details on the Expression of Interest process, submission requirements, and evaluation details, please see corresponding sections below:
Submission Requirements | Interested companies are invited to set out a summary of their company and relevant experience in a short Expression of Interest (EoI) for the task. The EOI should include the followings and be submitted via the link https://smrtr.io/d5BMr
|
Selection Process
SNV will review all Expressions of Interest received in accordance with the guidelines and criteria in this solicitation. SNV reserves the right to exclude any EOIs that do not meet the guidelines. Please note that SNV is unable to provide detailed feedback to those EOIs that are not selected.
Step 1: SNV will shortlist selected EOIs, and unsuccessful respondents will be notified. Successful applicants will be contacted by SNV.
Step 2: SNV will release Requests for Proposals (RFPs) for the specific activities and contract with the selected organizations/ consultants.
Protection of Information
We request that Expressions of Interest responses be free of any intellectual property that the applicant wishes to protect. Should offerors wish to include proprietary intellectual property that they believe would be helpful for SNV, please note the proprietary nature of such information. Costing information will be kept confidential and will not be shared beyond SNV.
Issuance of this EOI does not constitute a commitment, award, or engagement on the part of SNV nor does it commit SNV to any future commitment or engagement.
Note: SNV reserves the right to change or cancel this requirement in the EOI/or solicitation process at any time.
Details of the Call is in the file attached HERE.